Result

全ての施工事例

Distribution small pipe replacement work at Hatchobori, Chuo-ku

Construction details
High-density slurry type pipe jacking method with compatible type for underground obstruction
Completion date
Oct. 2015
Location of Construction
Chuo-ku, Tokyo

View the details

Water distribution small pipe replacement work at 1 Chuo Hatchobori

Construction details
High-density slurry type pipe jacking method with compatible type for underground obstruction
Completion date
Jul. 2016
Location of Construction
Chuo-ku, Tokyo

View the details

Sewer pipe laying work(No.28晴五-2)

Construction details
Obstacle removal pipe jacking
Completion date
May. 2018
Location of Construction
Chuo-ku, Tokyo

View the details

Sankenya Chishima trunk line training pipe construction work (Phase 1)

Construction details
High-density slurry type pipe jacking method with compatible type for underground obstruction
Completion date
Aug. 2013
Location of Construction
Osaka city, Osaka

View the details

First-class river Nishijima River tide embankment seismic retrofitting work 2017 (Ryoshima Bridge right bank)

Construction details
General Civil Engineering Works
Completion date
Nov. 2019
Location of Construction
Nishiyodogawa-ku, Osaka city, Osaka

View the details

110kV Mitsubishi Eba Line new pipeline construction

Construction details
High-density slurry type pipe jacking method with compatible type for underground obstruction
Completion date
Nov. 2016
Location of Construction
Hiroshima city, Hiroshima Prefecture

View the details

Among the planed supply works for the 1 Nishi-Shinbashi, the new construction of the Hibiya route cable tunnel (Phase 1)

Construction details
地中障害物対応型泥濃式推進工法High-density slurry type pipe jacking method with compatible type for underground obstruction
Completion date
Feb. 2012
Location of Construction
Minato-ku, Tokyo

View the details

5 / 512345
Inquiry