Construction details | Slurry type pipe jacking method |
---|---|
Method | Slurry type Mud max method |
Completion date | May. 2007 |
Location of Construction | Ojin-cho, Tokushima city, Tokushima Prefecture~Kitajima-cho, Itano-gun |
Ordering party | Shikoku Agricultural Administration Bureau |
Pipe diameter | φ2400㎜ |
Distance | L=367.0m |
Type of soil | Cobblestone mixed gravel |
Gravel size |
Nominal diameter | |
---|---|
Distance of pipe jacking | |
Type of soil | |
N value | |
Percentage of gravel | |
Maximum gravel size | |
Groundwater level | |
Overburden | |
Underground obstacles | |
Construction period |
Overburden 15m & within 367m of pipe jacking length, about 200m is the construction of the Yoshino River tributary (Imakiri River) river crossing. There was a high possibility that boulders & driftwood will appear, & the construction was carried out using a Slurry type & Mud pressure balanced type compound TBM that also supports boulders. The groundwater pressure was high, & it took time for initial driving & recovery of the TBM due to flooding at the time of launching & reaching.