| Construction details | High-density slurry type pipe jacking method |
|---|---|
| Method | SS moll method |
| Completion date | Aug. 2009 |
| Location of Construction | Nisshin city, Aichi Prefecture |
| Ordering party | Nisshin city |
| Pipe diameter | φ1000㎜ |
| Distance | L=964.0m |
| Type of soil | Gravel soil |
| Gravel size | φ100㎜ |
| Nominal diameter | φ1000mm |
|---|---|
| Distance of pipe jacking | L=964.0m |
| Type of soil | Gravel soil |
| N value | |
| Percentage of gravel | |
| Maximum gravel size | |
| Groundwater level | |
| Overburden | |
| Underground obstacles | |
| Construction period |