Construction details | High-density slurry type pipe jacking method with compatible type for underground obstruction |
---|---|
Method | Milling mole method |
Completion date | Apr. 2017 |
Location of Construction | Kashiwara city, Osaka |
Ordering party | Osaka Water Supply Authority |
Pipe diameter | φ800㎜ |
Distance | 307.485m |
Type of soil | Sandy soil, Gravel soil |
Gravel size | 420mm |
Nominal diameter | φ800㎜ |
---|---|
Distance of pipe jacking | 307.485m |
Type of soil | Sandy soil, Gravel soil |
N value | 16~37 |
Percentage of gravel | 29.4% |
Maximum gravel size | 420㎜ |
Groundwater level | GL-4.37m |
Overburden | 8.51m |
Underground obstacles | Floodwood(L=400mm) x 2 places |
Construction period | Feb. 2017~Apr. 2017 |
In the original plan, it was a High-density slurry type pipe jacking method with Boulder compatible type,
but the design was changed due to the excavation of boulders,
(Φ430mm) and floodwood (1900mm)during shaft excavation.
Construction result: Floodwood(400mm)was cut in two places.