Sankenya Chishima trunk line training pipe construction work (Phase 1)

Construction details High-density slurry type pipe jacking method with compatible type for underground obstruction
Method Milling mole method
Completion date Aug. 2013
Location of Construction Osaka city, Osaka
Ordering party Osaka city
Pipe diameter φ800㎜
Distance L=127.6m
Type of soil Sand, Silt
Gravel size

Work summary

Nominal diameter φ800mm
Distance of pipe jacking 127.61m
Type of soil Sand, Silt
N value
Percentage of gravel 0%
Maximum gravel size 0.0mm
Groundwater level GL-3.05m
Overburden 8.37m~6.25m
Underground obstacles 3 pine stakes
Construction period Daytime work (8h) Jul. 2013~Aug. 2013

Since the obstacle is a pine pile, we conducted forward exploration using electromagnetic waves and excavation management using a data logger.
Since the obstacle is a wooden stake, the cutter torque and thrust did not increase, and the presence or absence of obstacle cutting was confirmed by discharging wood pieces.

Cut and discharged piece of wood

Discharged wire piece (φ16) and gravel