Construction details | High-density slurry type pipe jacking method |
---|---|
Method | Apach method |
Completion date | Dec. 2012 |
Location of Construction | Fukui city, Fukui Prefecture |
Ordering party | Fukui city |
Pipe diameter | φ1000㎜ |
Distance | L=934.0m |
Type of soil | Sandy soil, Cohesive soil |
Gravel size |
Nominal diameter | φ1000mm |
---|---|
Distance of pipe jacking | L=934.0m |
Type of soil | Sandy soil, Cohesive soil |
N value | |
Percentage of gravel | |
Maximum gravel size | |
Groundwater level | |
Overburden | |
Underground obstacles | |
Construction period |
It was the toughest site in the pipe jacking work, because the R60m curve was constructed 30m after the launching and then the 900m straight construction was performed.