Result

2012 Onchi River East Drainage Zone 42nd Construction Zone (2011 11th Construction Zone Related) Sewerage Construction

Construction details High-density slurry type pipe jacking method with compatible type for underground obstruction
Method Milling mole method
Completion date Sep. 2013
Location of Construction Yao city, Osaka
Ordering party Yao city
Pipe diameter φ1800㎜
Distance L=119.9m
Type of soil Sandy soil and cohesive soil
Gravel size φ19㎜

Work summary

Nominal diameter φ1800mm
Distance of pipe jacking L=119.86m(Curve with R150m, R50m)
Type of soil Sandy soil and cohesive soil
N value 13
Percentage of gravel 4%
Maximum gravel size 19mm
Groundwater level GL-1.18m
Overburden 11.35m~10.09m
Underground obstacles Existing jack pipe(Φ1800mm) L=8.21m
Construction period Night work (6h) Apr. 2013~Sep 2013

Explosion-proof TBM was used for pipe jacking work to demolish the existing pipe (φ1800 mm NS pipe) 8.46 m.
Initially, there were concerns about the steel collar of the jacking pipe, the entanglement of the cutter head such as the rebar, and damage to the pinch valve, but it passed without any problems. After arriving, we inspected the cutter head, pinch valve, etc., but there was no noticeable damage.
I think we have taken the first step in promoting the renovation in the future by removing the existing pipes and constructing new pipe by the pipe jacking method.