| Construction details | High-density slurry type pipe jacking method with compatible type for underground obstruction |
|---|---|
| Method | Milling mole method |
| Completion date | Feb. 2015 |
| Location of Construction | Ichikawa city, Chiba Prefecture |
| Ordering party | Chiba Prefecture Edogawa Sewerage Office |
| Pipe diameter | φ1350㎜ |
| Distance | L=142.9m |
| Type of soil | Sandy soil and cohesive soil |
| Gravel size |
| Nominal diameter | φ1350mm |
|---|---|
| Distance of pipe jacking | L=142.021m (Curve with R150m) |
| Type of soil | Sandy soil and cohesive soil |
| N value | Average 18.5 |
| Percentage of gravel | - |
| Maximum gravel size | - |
| Groundwater level | GL-2.66m |
| Overburden | 21.34m~20.92m |
| Underground obstacles | Press-in caisson wall (Launching side L = 0.9m, reaching side L = 0.3m) (not detected this time, assumed SMW H-beam) |
| Construction period | Daytime work (10h) Dec. 2014~Feb. 2015 (2.5 months) |
During the construction of the lower stage (φ1350mm slurry type pipe jacking method, construction by another contractor), there was a hard soil obstacle & the bit was damaged, so the design was changed. In order to safely launch & reach, the press-in caisson wall (which was supposed to be unreinforced but actually contains a little rebar) was cut at L = 0.9m on the launching side & L = 0.3m on the reaching side.