Result

Oi Thermal Power Substation Related Pipeline New Construction

Construction details High-density slurry type pipe jacking method with compatible type for underground obstruction
Method Milling mole method
Completion date May. 2025
Location of Construction Shinagawa-ku, Tokyo
Ordering party Tokyo Electric Power Co., Inc.
Pipe diameter φ1350㎜
Distance L=190.5m
Type of soil Cohesive soil
Gravel size

Work summary

Nominal diameter φ1350mm
Distance of pipe jacking L=191.241m (Curve with R100m, VCR200m, VCR700m)
Type of soil Cohesive soil
N value 2~10
Percentage of gravel -
Maximum gravel size -
Groundwater level GL-3.1m
Overburden 4.03m
Underground obstacles Insurance method (possibility of concrete debris and metal pieces)
Construction period (Daytime work 8.0h) Jul. 2015~Oct. 2015

This working area is in the Oi Thermal Power Station, and since the site is a landfill, it does not mean that sheet piles and H-beam will surely come out, but whatever will hit, such as concrete debris and metal pieces.
Actually, we couldn't use the telescopic jack only with the pine stake and the concrete debris that seems to be the base of some structure.

Discharged wood pieces (Pine stake)

Discharged concrete debris and wood pieces (Pine stake)