Distribution small pipe replacement work at Hatchobori, Chuo-ku

Construction details High-density slurry type pipe jacking method with compatible type for underground obstruction
Method Milling mole method
Completion date Oct. 2015
Location of Construction Chuo-ku, Tokyo
Ordering party Tokyo Metropolitan Waterworks Bureau
Pipe diameter φ900㎜
Distance L=196.0m
Type of soil Sandy soil, Cohesive soil
Gravel size

Work summary

Nominal diameter φ900mm
Distance of pipe jacking 196.08m
Type of soil Sandy soil, Cohesive soil
N value 2
Percentage of gravel -
Maximum gravel size -
Groundwater level GL-2.33m
Overburden 6.47m
Underground obstacles Insurance method (NTT's leftover sheet pile may exist)
Construction period Daytime work (8.0h) Oct. 2015~Dec 2015 (2.0 months)

Initially, there was a possibility that the remaining sheet piles & wooden piles of the NTT shaft would come out at 50 m from the driving shaft, so the milling mall method was adopted, but TBM arrived without encountering any obstacles.