| Construction details | High-density slurry type pipe jacking method with compatible type for underground obstruction |
|---|---|
| Method | Milling mole method |
| Completion date | Aug. 2013 |
| Location of Construction | Osaka city, Osaka |
| Ordering party | Osaka city |
| Pipe diameter | φ800㎜ |
| Distance | L=127.6m |
| Type of soil | Sand, Silt |
| Gravel size |
| Nominal diameter | φ800mm |
|---|---|
| Distance of pipe jacking | 127.61m |
| Type of soil | Sand, Silt |
| N value | 7 |
| Percentage of gravel | 0% |
| Maximum gravel size | 0.0mm |
| Groundwater level | GL-3.05m |
| Overburden | 8.37m~6.25m |
| Underground obstacles | 3 pine stakes |
| Construction period | Daytime work (8h) Jul. 2013~Aug. 2013 |
Since the obstacle is a pine pile, we conducted forward exploration using electromagnetic waves and excavation management using a data logger.
Since the obstacle is a wooden stake, the cutter torque and thrust did not increase, and the presence or absence of obstacle cutting was confirmed by discharging wood pieces.