110kV Mitsubishi Eba Line new pipeline construction

Construction details High-density slurry type pipe jacking method with compatible type for underground obstruction
Method Milling mole method
Completion date Nov. 2016
Location of Construction Hiroshima city, Hiroshima Prefecture
Ordering party Chugoku Electric Power Co., Inc.
Pipe diameter Φ1000mm
Distance L=214.51m
Type of soil Clay-mixed sand, Sand layer, Hardpan, Rock reef
Gravel size 57mm

Work summary

Nominal diameter Φ1000mm
Distance of pipe jacking L=214.51m
Type of soil Clay-mixed sand, Sand layer, Hardpan, Bedrock
N value 3~4
Percentage of gravel -
Maximum gravel size 57㎜
Groundwater level GL-1.95m
Overburden 1.99~9.2m
Underground obstacles Steel sheet piles left on both sides of the existing box culvert at a distance of about 2 m across the upper part of the pipeline, etc.
Construction period Jun. 2016~Nov. 2016

Vertical alignment : Curve with ±R100m×4 places, Inclination pitch ±10%,0‰
Horizontal alignment : Curve with R100m x 1 place
The ground was divided into multiple layers, including clay-mixed sand and sand layer, Hardpan and bedrock.
Various metal pieces, including steel sheet piles, which were left on both sides of the existing box culvert at a distance of about 2 m across the upper part of the pipeline, were collected as underground obstacles.

Underground obstacles

Underground obstacles

Underground obstacles

フォームが表示されるまでしばらくお待ち下さい。

恐れ入りますが、しばらくお待ちいただいてもフォームが表示されない場合は、こちらまでお問い合わせください。



Inquiry