Construction details | 地中障害物対応型泥濃式推進工法High-density slurry type pipe jacking method with compatible type for underground obstruction |
---|---|
Method | Milling mole method |
Completion date | Feb. 2012 |
Location of Construction | Minato-ku, Tokyo |
Ordering party | Marunouchi Heat Supply Co., Ltd. |
Pipe diameter | φ2000㎜ |
Distance | L=78.3m |
Type of soil | Sandy silt |
Gravel size |
Nominal diameter | φ2000mm |
---|---|
Distance of pipe jacking | L=78.3m (Curve with R200m x 1 place) |
Type of soil | Sandy silt |
N value | 2 |
Percentage of gravel | - |
Maximum gravel size | - |
Groundwater level | GL-4.05m |
Overburden | 18.35m~17.89m |
Underground obstacles | H-beam (300mm) x 4 places, 2 pieces per cross section x 4 places |
Construction period | Day and night work (16h) Dec. 2011~Feb. 2012 (2 months) |
About 10 m after the launching, the first obstacle (H-beam, 300mm) was cut, and then the second and third H-beam (300mm) were cut at intervals of about 2 m. After that, we planned to cut the remaining 3 places of H-beams (300mm) until reception shaft.
However, TBM did not encounter the remaining three obstacles (H-beam, 300mm).